
Nedis
Nedis TV Hi-Fi Headphones Over Ear Stereo Long Lead 6m Cable With Volume Control - Black / Silver
GTIN: 05412810304905
MPN: ACAB222074
condition: new
Best listed price
£19.59
Delivery not stated• Boxed2me
Total unavailable until the retailer confirms delivery.
About this product
Brand Nedis Hifi headphones with neodymium drivers and gold-plated connectors delivering a superb and powerful sound. Ergonomic ear cups for an enhanced sound experience. Adjustable headband with comfortable padding for a perfect fit.Details• Neodymium drivers• Adjustable headband with comfortable cushion• Extra long cable of 6.0 metresPackage ContentsOver-ear headphones Product Dimensions Length 165 Width 100 Height 220 Weight 0.33 Kg
Compare all prices
1 shop| Shop | Price | Action |
|---|---|---|
B Boxed2me | £19.59 Delivery not stated | Visit shop |
Prices and availability are provided by retailers and may change.
Similar products

Boxed2me
Nedis
Nedis PC Headset | On-Ear | Stereo | USB Type-A / USB Type-C™ | Fold-Away Microphone | Black
£16.94

Boxed2me
Nedis
Nedis Wired In-Ear Headphones, 13mm Drivers for Enhanced Sound Balance & Clear Audio Quality, Built-In Microphone for Hands-Free Calling, 1.2m Flat Cab
£6.85

Boxed2me
Nedis
Nedis Wired Earphones | USB-C™ | Cable length: 1.20 m | Built-in microphone | Volume control | White
£13.02

Boxed2me
Nedis
Nedis PC Headset | On-Ear | Stereo | 2x 3.5 mm | Fold-Away Microphone | Black
£5.38

Boxed2me
Nedis
Nedis Portable Bluetooth Cube Party Speaker, 150W Peak Power, with Mega Bass, LED Lights, 5hr Playtime, TWS, AUX/USB / 6.35mm Mic Input
£127.39

Boxed2me
Nedis
Nedis Wireless RF TV Over-Ear Headphones with Charging Base, 25m Range, Volume Control, Toslink/Coax/RCA/3.5mm Input
£107.79

Boxed2me
Nedis
Nedis PC Headset | On-Ear | Stereo | 2x 3.5 mm | Fold-Away Microphone | Blue
£7.34

Boxed2me
Nedis
Nedis Bluetooth® Party Boombox | 6 hrs | 2.0 | 80 W | Media playback: AUX / Micro SD / USB | IPX5 | Linkable | Carrying handle | Party lights | Black
£58.79